UF Membrane Module 9 inch PVDF Ultrafiltration Membrane Module UFf2880 Replacing Project
Overview
UF Membrane Module 9 inch PVDF Ultrafiltration Membrane Module UFf2880 Replacing Project supplied by Zhuhai Bangmo Technology Co., Ltd. Listed under Water Treatment. Key published specifications: SS, Particles > 1μm Removal Rate ≥ 99%; Bacteria, Viruses > 4 log; Turbidity < 1NTU; TOC Removal Rate: 0-25%. Contact the supplier through the RFQ form for pricing, lead time and full datasheets.
Technical specifications
| SS, Particles > 1μm | Removal Rate ≥ 99% |
|---|---|
| Bacteria, Viruses | > 4 log |
| Turbidity | < 1NTU |
| TOC | Removal Rate: 0-25% |
| Filtering Type | Outside-in |
| Membrane Material | Modified PVDF |
| MWCO | 200K Dalton |
| Membrane Area | 77m2 |
| Membrane ID/OD | 0.8mm/1.3mm |
| Dimensions | Φ225mm*2360mm |
| Connector Size | DN50 Clamping; Air Inlet – 10mm air pipe |
| Pure Water Flux | 11,000L/H (0.15MPa, 25C) |
| Designed Flux | 40-120L/m2.hr (0.15MPa, 25C) |
| Suggested Working Pressure | ≤ 0.2MPa |
| Maximum Transmembrane Pressure | 0.15MPa |
| Maximum Backwashing Pressure | 0.15MPa |
| Air Washing Volume | 0.1-0.15N m3/m2 .hr |
| Air Washing Pressure | ≤ 0.1MPa |
| Maximum Working Temperature | 45C |
| PH Range | Working: 4-10; Washing: 2-12 |
| Operating Mode | Cross Flow or Dead End |
| Oil & Grease | ≤ 2mg/L |
| SS | ≤ 20mg/L |
| Total Iron | ≤ 1mg/L |
| Continuous Residual Chlorine | ≤ 5ppm |
| COD | Suggested ≤ 500mg/L |
| Backwashing Flow Rate | 100-150L/m2.hr |
| Backwashing Frequency | Every 30-60min. |
| Backwashing Duration | 30-60s |
| CEB Frequency | 0-4 times per day |