Zuo Shi PingIndustrial Supplier Directory

MBR Integrated Sewage Treatment Equipment Durable Integrated Wastewater Reactor

Model MBR-4

MBR Integrated Sewage Treatment Equipment Durable Integrated Wastewater Reactor

Overview

MBR Integrated Sewage Treatment Equipment Durable Integrated Wastewater Reactor supplied by Zhongqiao Enlightenment (Weifang) International Trade Co., Ltd. Listed under Water Treatment. Key published specifications: Installation Time 3 To 6 Months Depending On Capacity; Voltage 110V / 220V / 380V; Sludge Disposal Method Dewatering And Drying; pH Range 6.5 To 9.0. Contact the supplier through the RFQ form for pricing, lead time and full datasheets.

Technical specifications

Installation Time3 To 6 Months Depending On Capacity
Voltage110V / 220V / 380V
Sludge Disposal MethodDewatering And Drying
pH Range6.5 To 9.0
Maintenance FrequencyMonthly Inspection And Quarterly Maintenance
Running Weight (tons)72.98t
CertificationISO ,SGS
Running Weight72.98t
Energy Consumption0.3 To 0.6 KWh Per Cubic Meter Treated
OperationFully Automatic
Floor Area Required16 sqm
Sludge HandlingThickening, Dewatering, Digestion

Related products