Integrated Wastewater Treatment Equipment with PLC Control, Compact Design for Space-saving
Model MBR-4

Overview
Integrated Wastewater Treatment Equipment with PLC Control, Compact Design for Space-saving supplied by Zhongqiao Enlightenment (Weifang) International Trade Co., Ltd. Listed under Water Treatment. Key published specifications: Sludge Handling Thickening, Dewatering, Digestion; Sludge Disposal Method Dewatering And Drying; Running Weight 72.98t; Installation Time 3 To 6 Months Depending On Capacity. Contact the supplier through the RFQ form for pricing, lead time and full datasheets.
Technical specifications
| Sludge Handling | Thickening, Dewatering, Digestion |
|---|---|
| Sludge Disposal Method | Dewatering And Drying |
| Running Weight | 72.98t |
| Installation Time | 3 To 6 Months Depending On Capacity |
| Voltage | 110V / 220V / 380V |
| Energy Consumption | 0.3 To 0.6 KWh Per Cubic Meter Treated |
| Certification | ISO ,SGS |
| Motor | Nissei,SEW/NORD/Customize,Sumitomo,Sew |
| Voltage Options | 110V / 220V / 380V |
| Type | Integrated Sewage Treatment Plant |
| Suitable for | Industrial Wastewater Treatment Equipment applications |
| Maintenance Frequency | Monthly Inspection and Quarterly Maintenance |